1- Due to the limited window of construction, we came up with a way to incrementally keep designing the building even after the landfill is closed. The follicles become preexisting condition of a post landfill site.

2- Follicles are inserted before the mound is capped (in around 1990’s).

3- Due to their form with a pointy bottom, and heavy bottom, they sink with their own weight. In time, they settle at the bottom of the landfill.

4- Follicles grow as the landfill rises. 

5- There is an abundance of follicles on the capped landfill. 

6- The methane exertion pipe is indicated in relation to the follicle.